lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft for Small…
SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
Amazon.com Price: $11.99 (as of 08/04/2023 23:18 PST- Details)
SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 10foot,color black, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Specification: lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft for Small…
|
User Reviews
Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft for Small…”
Amazon.com Price: $11.99 (as of 08/04/2023 23:18 PST- Details)
There are no reviews yet.